Rate and Fee Scheduled last updated July 1, 2025.
-
Water Usage Charges
Effective July, 1, 2025
APPLICATION REFERENCE LOCATION INSPECTION TYPE DESCRIPTION SCHEDULED TIME INSPECTOR NAME 202502705 416 MOORLAND WAY INSULATION 8:30-10:30 Kirk Smith 202600392 203 ROBERTA LOOP FOUNDATION INSPECTION 9:15-11:15 Kirk Smith 202502233 120 RYKER RD W UNDER SLAB REINSPECTION 9:15-11:15 Kirk Smith 202600364 224 ROBERTA LOOP UNDER SLAB INSPECTION 9:15-11:15 Kirk Smith 202600374 212 MIRIAM DR W UNDER SLAB REINSPECTION 9:15-11:15 Kirk Smith 202502608 110 EUNICE ST ELECTRICAL ROUGH IN 9:15-11:15 Kirk Smith 202600276 118 RYKER RD UNDERSLAB 9:15-11:15 Kirk Smith 202400276 126 MACK JONES RD FINAL/CERTIF OF COMPLIANCE 9:45-11:45 Ronald Schaecher 202600183 128 TUSCORORA LN ROUGH IN 10:30-12:30 Ronald Schaecher 202600183 128 TUSCORORA LN GAS TEST 10:30-12:30 Ronald Schaecher 202600183 128 TUSCORORA LN TEMPORARY POWER INSPECTION 10:30-12:30 Ronald Schaecher 202600181 200 BAXTER STATION BLVD ROUGH IN 10:30-12:30 Ronald Schaecher 202600181 200 BAXTER STATION BLVD GAS TEST 10:30-12:30 Ronald Schaecher 202600181 200 BAXTER STATION BLVD TEMPORARY POWER INSPECTION 10:30-12:30 Ronald Schaecher 202600206 130 TUSCORORA LN ROUGH IN 10:30-12:30 Ronald Schaecher 202600206 130 TUSCORORA LN GAS TEST 10:30-12:30 Ronald Schaecher 202600206 130 TUSCORORA LN TEMPORARY POWER INSPECTION 10:30-12:30 Ronald Schaecher 202600334 128 WILDWOOD DR FINAL/CERTIF OF COMPLIANCE 9:15-11:15 Ronald Schaecher 202502013 115 ARTISAN WAY FINAL/CERTIF OF COMPLIANCE 8:30-10:30 Ronald Schaecher 202502167 130 SAVANNAH AVE FINAL ELECTRICAL INSPECTION 10:45-12:45 Sean Strydom 202600355 120 HAMPTON RD FOUNDATION INSPECTION 9:30-11:30 Sean Strydom 202600219 104 POPLARWOOD DR ELECTRICAL ROUGH IN 8:30-10:30 Sean Strydom 202501114 1555 WATERLILY RD ELECTRICAL ROUGH IN 10:00-12:00 Sean Strydom * Consumption over 2,000 gallons is billed retroactive to the first gallon used.
Commercial master meter accounts are charged at the above rates per unit served. Hotels and motels: Four rooms equal one commercial master meter billing unit.
Local Government/Board of Education – same as commercial rates.
Fire Service (sprinkler systems) – same as commercial rates.
-
Sewer Charges
Effective July, 1, 2025
Usage/Month (in gallons)* 0 - 2000 $40.00 Base Rate Up to 5,000 Base Rate + $18.07 per 1,000 gallons
Up to 10,000 Base Rate + $22.08 per 1,000 gallons Up to 15,000 Base Rate + $26.10 per 1,000 gallons Up to 20,000 Base Rate + $30.11 per 1,000 gallons All over 20,000 Base Rate + $34.12 per 1,000 gallons Other Sewer Charges Broken clean-out repair $75.00
Broken clean-out repair - Contractor-Developer $125.00
Damage clean outs/stub out piping - Contractor-Developer $350.00
Sewer pipe repair Cost + 20% Sewer Installation Fee Cost + 20% -
Water Connection Fees
Meter Size
Connection Fee
Contractor Installs No Fee All installation costs for labor, materials and equipment shall be paid by the owner, developer or purchaser, 5/8 inch $1,000.00
County staff installs connection
5/8 inch irrigation $1,000.00 Irrigation meter, 5/8 inch, if existing water meter present to make connection (Piggyback) $1,000.00 greater than
5/8 inch irrigationActual Cost + 20%
-
Developmental Fees
Meter Size
Connection Fee
Water 5/8 inch $2,041.00
1 inch $5,102.00 2 inch $16,325.00
3 inch $32,651.00 4 inch $51,017.00 6 inch $102,034.00 8 inch $163,254.00 10 inch $244,881.00 Centers of Worship $3,000 .00 6 inch or greater Fire Service Same as new install fees above.Standalone Irrigation Meter 5/8 inch $2,041.00
1 inch $5,102.00 2 inch $16,325.00
3 inch $32,651.00 4 inch $51,017.00 6 inch $102,034.00 8 inch $163,254.00 10 inch $244,881.00 Sewer 5/8 inch $5,418.00
1 inch $.13,545.00 1 1/2 inch $27,090.00 2 inch $43,344.00
3 inch $86,688.00 4 inch $135,450.00 6 inch $270,900.00 8 inch $433,440.00 10 inch $650,160.00 -
Deposit
Residential Renter deposit $150.00Residential High-risk deposit (owner or renter) *$200.00Fire hydrant meter $2,500.00* or 3 months' billing of previous usage, whichever is greater -
Charges & Other Fees
Open/reopen/transfer account $25.00 Special request meter reading $25.00 Reread meter - our reading correct $25.00 Reread meter - our reading incorrect No Charge Reconnection fee (after cutoff for nonpayment) 8:00 a.m. - 5:00 p.m. $50.00 Returned check fee $35.00 Meter Box Actual cost + 20% Turn on/off fee, per occurrence Normal working hours $25.00 Meter testing fee If meter accurate $50.00 If more than 2.5% inaccurate No Charge Pipe pressure/leakage test $150.00 Pipe pressure/leakage retest $150.00 Fire hydrant meter setup fee $50.00 Meter accessibility charge $35.00 -
Parts & Labor
All replacement parts are charged at cost plus $20.00 Labor Charges: $60.00 per man per hour Ditch Witch: $125.00 per hour Backhoe: $125.00 per hour Excavator: $125.00 per hour